Premier Graphene lands first Mexico defense contract as graphene materials move into production testing

Premier Graphene said on April 23, 2026 that it secured its first contract with Mexico’s defense sector, a move that turns its graphene-based protective-wear materials into an initial production run for qualification testing.

By |2026-04-24T04:16:44+00:00April 24th, 2026|News|

Black Swan Graphene lifts UK production capacity past 140 tonnes as graphene manufacturing scales up

Black Swan Graphene says its expanded Consett, United Kingdom facility is now operating at industrial scale, with annual output capacity lifted to more than 140 tonnes. The company’s latest commissioning step marks a concrete shift from pilot production toward repeatable manufacturing for commercial graphene products.

By |2026-04-24T03:46:14+00:00April 24th, 2026|News|

GMG names Rio Tinto veteran to lead graphene production scale-up as 10-tonne plant nears completion

Graphene Manufacturing Group has appointed Stuart Watson, a former global technical development head at Rio Tinto, as chief production growth officer while saying its second-generation graphene plant in Queensland remains on track for commissioning by the end of June 2026.

By |2026-04-23T01:16:16+00:00April 23rd, 2026|News|

GMG secures U.S. patent and China approval for graphene engine-oil additive as it pushes manufacturing scale-up

Graphene Manufacturing Group said on April 20, 2026, that its graphene-based engine-oil additive G LUBRICANT has secured a 20-year U.S. patent and approval in China, giving the product stronger protection as the company works to commercialize output from its methane-to-graphene process.

By |2026-04-22T04:47:34+00:00April 22nd, 2026|News|

Black Swan Graphene expands UK output above 140 tonnes a year as manufacturing scale-up advances

Black Swan Graphene says commissioning of a large-scale production system at its Consett, United Kingdom facility has lifted annual output capacity beyond 140 tonnes, a significant step for a sector where scale-up remains a central hurdle.

By |2026-04-22T01:46:15+00:00April 22nd, 2026|News|
Go to Top